IHG Brands
Manufacturing Process

Our Process

End-to-End
Structured Delivery

From specification review to handover documentation, every step is tracked, documented, and delivered with precision.

The Execution Bridge

📋
Spec
🔍
Source
📑
Submit
Approve
🏭
Produce
🔬
QC
🚢
Ship
🔧
Install
🤝
Handover

Single accountability from specification to handover — no gaps, no drama

01

Scope Definition

Review design documentation, identify procurement scope, establish specifications.

Scope matrix
Specification review
Timeline baseline
02

Vendor Sourcing

Identify qualified vendors, obtain quotations, negotiate terms.

Vendor shortlist
Comparative analysis
Commercial terms
03

Submittals & Approvals

Prepare submittals, coordinate designer reviews, manage approvals.

Material submittals
Sample coordination
Approval tracker
04

Production & QC

Monitor manufacturing, conduct factory inspections, ensure compliance.

Production schedule
QC reports
Inspection photos
05

Logistics & Delivery

Coordinate shipping, manage customs, sequence deliveries.

Shipping schedule
Delivery receipts
Site coordination
06

Installation & Handover

Supervise installation, conduct snagging, compile documentation.

As-built records
O&M manuals
Warranty certificates

Why It Works

Documentation at Every Step

Submittals & Approvals

Every item goes through a formal submittal process. No shortcuts, no surprises.

  • Material samples
  • Finish specifications
  • Technical data sheets
  • Designer approval signatures

Quality Control

Multi-stage inspections from factory to site ensure consistent quality.

  • Factory pre-production check
  • In-line production QC
  • Pre-shipment inspection
  • Site receiving check

Handover Package

Complete documentation for seamless operations and maintenance.

  • As-built drawings
  • O&M manuals
  • Warranty certificates
  • Spares inventory list

Our Guarantee

Documented Excellence

Quality Assurance Protocol

Pre-Production Review

Design specs verified against approved drawings

Material Certification

All materials certified & documented

Factory Inspection

On-site QC at manufacturing facility

Pre-Shipment Check

Final inspection before dispatch

Delivery Verification

Item-by-item check against BOQ

Installation Audit

Post-installation quality sign-off

Submittal Package

IHG-DOC-2025-0142

Generated automatically

Product Specifications
Material Certifications
Shop Drawings
Finish Samples
Warranty Documents

Every project receives comprehensive documentation

Handover Dossier

IHG-DOC-2025-0142

Generated automatically

As-Built Documentation
Maintenance Manuals
Warranty Certificates
Spare Parts List
Contact Directory

Every project receives comprehensive documentation

Zero Unauthorized Substitutions

Every item delivered matches approved specifications exactly

Complete Documentation Trail

Full audit trail from specification to handover

Single Point Accountability

One contact, one responsibility, no finger-pointing

On-Time Delivery Promise

Proactive logistics planning prevents delays

Video Walkthroughs

See Our Process in Action

How We Manage Submittals
3:45

How We Manage Submittals

See our documentation-first approach to managing FF&E submittals and approvals.

Inside Our QA Process
4:20
Coming Soon

Inside Our QA Process

A behind-the-scenes look at our multi-point quality control protocol.

How to Prevent Hotel Delays
5:15
Coming Soon

How to Prevent Hotel Delays

Key strategies for avoiding common FF&E procurement delays in hotel projects.

See it in action

Our Process,
Your Success

Review real project documentation and see how we deliver predictable outcomes.